The EPC project is based on Siemens S7-400H/F.
The Client is National Iranian South Oil Company (NISOC)
Retrofit of Unit Control Panel of Ruston TB4000 Gas Turbine in Shahid Zanganeh (Sabzab) Pump Station.
Scope of work were General Logic, Protection, Over Speed Protection, Start Sequence, ... development on Siemens S7-300 PLC.
Client was IOPTC.
This project had more than 1400 I/Os.
this system is implemented based on S7-400H system including Engineering, Programming, Procurement, Installation and Commissioning.
This F&G system is developed based on Siemens S-400HF series with conventional detectors and signals.
this project consist of adding more than 400 I/Os to existing DCS and ESD based on Siemens S7-400H/HF PLCs
Client: National Iranian South Oil Company (NISOC)
this project consist of Supply Woodward Control Valve GS-16 of Rolls-Roycs Gas Turbine
Client: Fajr Jam Gas Refinery Company
This project had more than 750 I/Os.
this system is implemented based on Siemens S7-400H/F system including Engineering, Programming, Procurement, Installation and Commissioning.
The Client is Setiran Company
The Client is Shiraz Petrochemical Company